A bill of materials (BOM) is a formal and complete hierarchal documentation of the specific items that need to be included in a finished product. This list can include specific components, assemblies, and subassemblies. Bills of materials can be drafted at the onset of a project as part of the estimating and budgeting process, and can also be used in the determination of scheduling. Bills of materials are used in a number of different industries. One rather simplistic example of a bill of material would be the following. In a plant devoted to the manufacture and packaging of a billiards set for retail sale, the bill of materials would include all components required to be in the final box for sale (billiards cues, billiards balls, chalk, billiards table), all of the assemblies required (assembling the pool cues, assembling the billiards table), and all subassemblies (attaching the felt surface to the billiards table, etc.). The bill of materials is typically one of the first items drafted upon project inception.
PMI, PMP, CAPM, PMI-ACP, PMBOK and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc.
Project Victor is a registered mark of Project Victor Co.,
Ltd. The certification names are the trademarks of their respective owners. View Disclaimer